← Hawden Road Tonbridge, - 108736

Spill evidence · River Hub

Hawden Road Tonbridge, - 108736

Combined sewer overflow · SWS00407 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Thursday, 4 January 2024
Started
4 Jan 2024, 16:16
Ended
5 Jan 2024, 12:42
Duration
20 hours 26 minutes
Receiving water
Mid Medway from Eden Confluence to Yalding
Parish
Hildenborough

Rainfall evidence

Daily rainfall at the matched gauge (Leigh) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
04/01/2024 (spill day)no data
03/01/2024no data
02/01/2024no data
01/01/2024no data
31/12/2023no data

River flow that day: 41.808 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
19 counted spills · 126 h total
Monitor uptime (2024)
61% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00407). Rainfall: EA Hydrology gauge 14ad0c4f-65cc-4dd9-afd3-44f13ceaea7f_294452. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Hawden Road Tonbridge, - 108736 — River Medway Data