← Pellings Wood Crowborough, - 103289

Spill evidence · River Hub

Pellings Wood Crowborough, - 103289

Combined sewer overflow · SWS00236 · feeds REDGATE MILL STW
No rain data

The discharge

Spill day
Sunday, 25 February 2024
Started
25 Feb 2024, 20:00
Ended
26 Feb 2024, 05:30
Duration
9 hours 30 minutes
Receiving water
Jarvis Brook
Parish
Crowborough

Rainfall evidence

Daily rainfall at the matched gauge (Redgate Mill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
25/02/2024 (spill day)no data
24/02/2024no data
23/02/2024no data
22/02/2024no data
21/02/2024no data

River flow that day: 34.941 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
33 counted spills · 131 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00236). Rainfall: EA Hydrology gauge c94d0481-e8b7-41a0-929d-275d7edc7187. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.