← Tinkers Lane Ticehurst, - 108363

Spill evidence · River Hub

Tinkers Lane Ticehurst, - 108363

Pumping station overflow · SWS00875 · feeds TICEHURST STW
No rain data

The discharge

Spill day
Thursday, 4 April 2024
Started
4 Apr 2024, 02:06
Ended
5 Apr 2024, 04:28
Duration
1 day 2 hours
Receiving water
Bewl
Parish
Ticehurst

Rainfall evidence

Daily rainfall at the matched gauge (Lamberhurst) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
04/04/2024 (spill day)no data
03/04/2024no data
02/04/2024no data
01/04/2024no data
31/03/2024no data

River flow that day: 23.575 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
68 counted spills · 777 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00875). Rainfall: EA Hydrology gauge 7e997ddd-1de6-49e8-9c4a-9306761e7638. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.