← Priory Mill Tonbridge Ceo - 108706

Spill evidence · River Hub

Priory Mill Tonbridge Ceo - 108706

Pumping station overflow · SWS00679 · feeds TONBRIDGE STW
No rain data

The discharge

Spill day
Saturday, 24 August 2024
Started
24 Aug 2024, 09:24
Ended
24 Aug 2024, 19:08
Duration
9 hours 44 minutes
Receiving water
Somerhill Stream
Parish
Capel

Rainfall evidence

Daily rainfall at the matched gauge (Pembury) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
24/08/2024 (spill day)no data
23/08/2024no data
22/08/2024no data
21/08/2024no data
20/08/2024no data

River flow that day: 1.199 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
101 counted spills · 1387 h total
Monitor uptime (2024)
95% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00679). Rainfall: EA Hydrology gauge 8d901b06-e5ca-469c-9c88-8d3de8ddda27. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Medway Data.
Spill evidence — Priory Mill Tonbridge Ceo - 108706 — River Medway Data