← Marston Magna Church Lane

Spill evidence · River Hub

Marston Magna Church Lane

Pumping station overflow · WXW00694 · feeds HORNSEY BRIDGE STW CATCHMENT
Wet weather

The discharge

Spill day
Saturday, 6 July 2024
Started
6 Jul 2024, 01:24
Ended
6 Jul 2024, 04:14
Duration
2 hours 50 minutes
Receiving water
Corton Denham Stream
Parish
Marston Magna

Rainfall evidence

Daily rainfall at the matched gauge (Sherborne) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
06/07/2024 (spill day)0 mmdry
05/07/202433.5 mmrain
04/07/20244.7 mmrain
03/07/20241.2 mmrain
02/07/20240 mmdry

River flow that day: 2.29 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
88 counted spills · 1549 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00694). Rainfall: EA Hydrology gauge a0855c39-31a2-4e0b-b4de-16ea4453d0eb. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.