← Ilminster Ashwell Storm Tank

Spill evidence · River Hub

Ilminster Ashwell Storm Tank

Storm overflow at the works · WXW00579 · feeds ILMINSTER STW
Wet weather

The discharge

Spill day
Saturday, 31 January 2026
Started
31 Jan 2026, 23:42
Ended
1 Feb 2026, 00:00
Duration
18 minutes
Receiving water
Isle - Upper to conf Cad Bk
Parish
Ilminster

Rainfall evidence

Daily rainfall at the matched gauge (Chards Snowdon Hill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
31/01/2026 (spill day)3.8 mmrain
30/01/20264.2 mmrain
29/01/202611.4 mmrain
28/01/20261.4 mmrain
27/01/20262 mmrain

River flow that day: 22.984 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00579). Rainfall: EA Hydrology gauge d1803c5a-e461-404b-8750-7f946456a6c6. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.