← Othery Rye Lane/ Summerhedge Road

Spill evidence · River Hub

Othery Rye Lane/ Summerhedge Road

Pumping station overflow · WXW01086 · feeds BRIDGWATER STW
Wet weather

The discharge

Spill day
Thursday, 2 May 2024
Started
2 May 2024, 01:14
Ended
2 May 2024, 01:50
Duration
36 minutes
Receiving water
King's Sedgemoor Drain - Henley Sluice to mouth
Parish
Othery

Rainfall evidence

Daily rainfall at the matched gauge (West Sedgemoor) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/05/2024 (spill day)0.539 mmrain
01/05/202432.704 mmrain
30/04/20245.516 mmrain
29/04/20240.337 mmrain
28/04/20240 mmdry

River flow that day: 15.746 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
16 counted spills · 118 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01086). Rainfall: EA Hydrology gauge a92acb90-1626-40c3-865f-bd24386626e3. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.