← Cannington Marsh Lane

Spill evidence · River Hub

Cannington Marsh Lane

Combined sewer overflow · WXW00691 · feeds CANNINGTON STW
Wet weather

The discharge

Spill day
Sunday, 25 February 2024
Started
25 Feb 2024, 15:32
Ended
26 Feb 2024, 00:08
Duration
8 hours 36 minutes
Receiving water
Cannington Bk - Lower
Parish
Cannington

Rainfall evidence

Daily rainfall at the matched gauge (Rivers House) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/02/2024 (spill day)15.755 mmrain
24/02/20240.487 mmrain
23/02/20242.683 mmrain
22/02/20247.657 mmrain
21/02/20246.878 mmrain

River flow that day: 34.941 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2024)
32 counted spills · 118 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00691). Rainfall: EA Hydrology gauge ea1c4478-b21e-432b-b7e5-6d3122789732. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Cannington Marsh Lane — River Parrett Data