← Drayton Ducks Lane

Spill evidence · River Hub

Drayton Ducks Lane

Pumping station overflow · WXW00383 · feeds LANGPORT STW
Wet weather

The discharge

Spill day
Wednesday, 27 November 2024
Started
27 Nov 2024, 05:03
Ended
27 Nov 2024, 06:19
Duration
1 hour 16 minutes
Receiving water
Parrett - R Yeo to West Sedgemoor Drain
Parish
Drayton

Rainfall evidence

Daily rainfall at the matched gauge (West Sedgemoor) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/11/2024 (spill day)0 mmdry
26/11/20247.621 mmrain
25/11/20240.37 mmrain
24/11/202420.084 mmrain
23/11/202423.413 mmrain

River flow that day: 18.273 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
15 counted spills · 167 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00383). Rainfall: EA Hydrology gauge a92acb90-1626-40c3-865f-bd24386626e3. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Drayton Ducks Lane — River Parrett Data