← Limington Main

Spill evidence · River Hub

Limington Main

Pumping station overflow · WXW00630 · feeds HORNSEY BRIDGE STW CATCHMENT
Wet weather

The discharge

Spill day
Sunday, 7 September 2025
Started
7 Sept 2025, 10:23
Ended
7 Sept 2025, 11:37
Duration
1 hour 15 minutes
Receiving water
Bearley Brook
Parish
Yeovilton and District

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
07/09/2025 (spill day)5.895 mmrain
06/09/202515.429 mmrain
05/09/20250 mmdry
04/09/20250.845 mmrain
03/09/20258.316 mmrain

River flow that day: 0.875 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
37 counted spills · 534 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00630). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Limington Main — River Parrett Data