← Stoford Hillside Main
Spill evidence · River Hub
Stoford Hillside Main
Combined sewer overflow · WXW01064 · feeds YEOVIL STW
Wet weather
The discharge
- Spill day
- Wednesday, 21 January 2026
- Started
- 21 Jan 2026, 06:35
- Ended
- 21 Jan 2026, 06:51
- Duration
- 16 minutes
- Receiving water
- Sutton Bingham Stream - conf Closworth Str to conf Yeo
- Parish
- Barwick and Stoford
Rainfall evidence
Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 21/01/2026 (spill day) | 11.558 mm | rain |
| 20/01/2026 | 27.655 mm | rain |
| 19/01/2026 | 5.03 mm | rain |
| 18/01/2026 | 8.038 mm | rain |
| 17/01/2026 | 0.128 mm | dry |
River flow that day: 34.598 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.7 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01064). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.