← Stawell Ford Lane

Spill evidence · River Hub

Stawell Ford Lane

Pumping station overflow · WXW01062 · feeds BRIDGWATER STW
Wet weather

The discharge

Spill day
Sunday, 17 March 2024
Started
17 Mar 2024, 04:36
Ended
17 Mar 2024, 11:18
Duration
6 hours 42 minutes
Receiving water
King's Sedgemoor Drain - Henley Sluice to mouth
Parish
Bawdrip

Rainfall evidence

Daily rainfall at the matched gauge (Gold Corner) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
17/03/2024 (spill day)0.078 mmdry
16/03/202411.845 mmrain
15/03/20246.932 mmrain
14/03/20241.813 mmrain
13/03/20240 mmdry

River flow that day: 15.785 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
21 counted spills · 109 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01062). Rainfall: EA Hydrology gauge 40e8abd2-f395-42c8-95b1-b22c3348b0b5_405278. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.