← Tintinhull Ash Bearley Lane Storm Tank

Spill evidence · River Hub

Tintinhull Ash Bearley Lane Storm Tank

Storm overflow at the works · WXW01138 · feeds TINTINHULL ASH STW CATCHMENT
Wet weather

The discharge

Spill day
Sunday, 18 February 2024
Started
18 Feb 2024, 00:30
Ended
19 Feb 2024, 15:30
Duration
1 day 15 hours
Receiving water
Yeo Ds Over Compton
Parish
Tintinhull

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/02/2024 (spill day)1.205 mmrain
17/02/202427.556 mmrain
16/02/20240.195 mmdry
15/02/202421.379 mmrain
14/02/20240.985 mmrain

River flow that day: 20.518 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 9.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
89 counted spills · 1186 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01138). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.