← Watchet Mill Street

Spill evidence · River Hub

Watchet Mill Street

Combined sewer overflow · WXW00048 · feeds WATCHET STW
Wet weather

The discharge

Spill day
Sunday, 25 January 2026
Started
25 Jan 2026, 08:02
Ended
25 Jan 2026, 09:50
Duration
1 hour 48 minutes
Receiving water
Stogursey BK
Parish
Watchet

Rainfall evidence

Daily rainfall at the matched gauge (Birds Hill) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/01/2026 (spill day)2.986 mmrain
24/01/202628.256 mmrain
23/01/202624.104 mmrain
22/01/202614.791 mmrain
21/01/202625.348 mmrain

River flow that day: 37.181 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00048). Rainfall: EA Hydrology gauge e7d9bc1c-3332-4c41-b10f-7bc6351c762c. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.
Spill evidence — Watchet Mill Street — River Parrett Data