← Yeovil Without Off Stone Lane Inlet

Spill evidence · River Hub

Yeovil Without Off Stone Lane Inlet

Storm overflow at the works · WXW01294 · feeds YEOVIL WITHOUT STW CATCHMENT
Wet weather

The discharge

Spill day
Wednesday, 26 February 2025
Started
26 Feb 2025, 10:23
Ended
26 Feb 2025, 10:39
Duration
16 minutes
Receiving water
Bearley Brook
Parish
Mudford

Rainfall evidence

Daily rainfall at the matched gauge (Sutton Bingham) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/02/2025 (spill day)1.8 mmrain
25/02/202511 mmrain
24/02/20256 mmrain
23/02/202526.4 mmrain
22/02/20250.8 mmrain

River flow that day: 20.976 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.1 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2025)
45 counted spills · 180 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01294). Rainfall: EA Hydrology gauge d5b6b189-faf9-4f9e-8809-1c4936aeecda. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.