← Long Sutton Bennetts Orchard
Spill evidence · River Hub
Long Sutton Bennetts Orchard
Pumping station overflow · WXW00128 · feeds LANGPORT STW
Wet weather
The discharge
- Spill day
- Sunday, 11 February 2024
- Started
- 11 Feb 2024, 08:35
- Ended
- 11 Feb 2024, 20:25
- Duration
- 11 hours 50 minutes
- Receiving water
- King's Sedgemoor Drain - Henley Sluice to mouth
- Parish
- Long Sutton
Rainfall evidence
Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 11/02/2024 (spill day) | 0.015 mm | dry |
| 10/02/2024 | 1.869 mm | rain |
| 09/02/2024 | 3.676 mm | rain |
| 08/02/2024 | 9.529 mm | rain |
| 07/02/2024 | 10.163 mm | rain |
River flow that day: 20.93 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.7 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 104 counted spills · 1934 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00128). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Parrett Data.