Is the river healthy?

Phosphate goes from poor above Hailsham South works to good below it, an improvement

The Environment Agency samples the river above and below Hailsham South sewage works, and the works' own treated effluent. Read together, they show what the works adds. Averages over 2023–2025.

Phosphate (mg/l)

Flow →
Above the worksupstream of Hailsham South STW0.349Poor · 30 samples
Hailsham South works
treated effluent enters here
Below the worksdownstream of Hailsham South (New) STW0.038Good · 27 samples

In the works’ treated effluent (Hailsham South New STW): 0.010 mg/l, 37 samples.

Ammonia (mg/l)

Flow →
Above the worksupstream of Hailsham South STW0.769Poor · 30 samples
Hailsham South works
treated effluent enters here
Below the worksdownstream of Hailsham South (New) STW0.368Moderate · 28 samples

In the works’ treated effluent (Hailsham South New STW): 0.349 mg/l, 73 samples.

Storm overflows are not in these averages

The EA samples on a schedule, rarely during a spill, so untreated sewage from the works’ storm overflow barely shows here. See the river’s spills

How these are matched

River Hub pairs sampling points the EA names as upstream (“U/S”) and downstream (“D/S”) of the same works. Bands are indicative Water Framework Directive standards; readings below the lab’s detection limit count at half the limit. Source: Environment Agency Water Quality Archive, Open Government Licence.

← River health