← Rattle Road Westham Ceo - 108315
Spill evidence · River Hub
Rattle Road Westham Ceo - 108315
Pumping station overflow · SWS00663 · feeds EASTBOURNE STW
Dry spill
Evidence strength
Medium confidence- ✓ Sustained discharge (≥1 h)
- ✓ Dry on the EA 1-day window
- ✓ Rain gauge close (≤5 km)
- ✓ Monitor 100% operational that year
The discharge
- Spill day
- Thursday, 5 September 2024
- Started
- 5 Sept 2024, 11:34
- Ended
- 5 Sept 2024, 13:19
- Duration
- 1 hour 44 minutes
- Receiving water
- Langney Sewer at Eastbourne
- Parish
- Westham
Rainfall evidence
Daily rainfall at the matched gauge (Pevensey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 05/09/2024 (spill day) | 0 mm | dry |
| 04/09/2024 | 0 mm | dry |
| 03/09/2024 | no data | |
| 02/09/2024 | 0 mm | dry |
| 01/09/2024 | 0 mm | dry |
River flow that day: 3.75 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 3.2 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Pevensey Bay
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 7 counted spills · 26 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00663). Rainfall: EA Hydrology gauge 53252b42-d77a-47ba-9001-6def0b761af0. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Pevensey Levels Data.