← Rattle Road Westham Ceo - 108315

Spill evidence · River Hub

Rattle Road Westham Ceo - 108315

Pumping station overflow · SWS00663 · feeds EASTBOURNE STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Thursday, 5 September 2024
Started
5 Sept 2024, 11:34
Ended
5 Sept 2024, 13:19
Duration
1 hour 44 minutes
Receiving water
Langney Sewer at Eastbourne
Parish
Westham

Rainfall evidence

Daily rainfall at the matched gauge (Pevensey) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: No rain data4-day window: No rain data
DateRainfall
05/09/2024 (spill day)0 mmdry
04/09/20240 mmdry
03/09/2024no data
02/09/20240 mmdry
01/09/20240 mmdry

River flow that day: 3.75 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Pevensey Bay
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
7 counted spills · 26 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00663). Rainfall: EA Hydrology gauge 53252b42-d77a-47ba-9001-6def0b761af0. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Pevensey Levels Data.