← Upton Moorlands Way

Spill evidence · River Hub

Upton Moorlands Way

Pumping station overflow · WXW00755 · feeds LYTCHETT MINSTER STW
Wet weather

The discharge

Spill day
Wednesday, 21 February 2024
Started
21 Feb 2024, 17:00
Ended
21 Feb 2024, 19:30
Duration
2 hours 30 minutes
Receiving water
Sherford River
Parish
Lytchett Minster and Upton

Rainfall evidence

Daily rainfall at the matched gauge (Alderney) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
21/02/2024 (spill day)10.29 mmrain
20/02/20245.32 mmrain
19/02/20240.21 mmdry
18/02/20240.04 mmdry
17/02/202426.76 mmrain

River flow that day: 17.859 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Poole Harbour Rockley Sands
Shellfish water
Poole Bay; Poole Harbour North; Poole Harbour South; Poole Harbour West
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
31 counted spills · 143 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00755). Rainfall: EA Hydrology gauge e01eaf91-3a94-47d2-a987-d24706fec3bd. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Poole Harbour Rivers Data.