← Broadmayne West Knighton Road Storm Tank

Spill evidence · River Hub

Broadmayne West Knighton Road Storm Tank

Storm overflow at the works · WXW00191 · feeds BROADMAYNE STW CATCHMENT
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Tuesday, 10 December 2024
Started
10 Dec 2024, 07:30
Ended
10 Dec 2024, 11:45
Duration
4 hours 15 minutes
Receiving water
Tadnoll Brook (including Empool Bottom)
Parish
Broadmayne

Rainfall evidence

Daily rainfall at the matched gauge (Sutton Poyntz) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/12/2024 (spill day)0 mmdry
09/12/20240.03 mmdry
08/12/20240 mmdry
07/12/20243.64 mmrain
06/12/20244.96 mmrain

River flow that day: 8.06 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
86 counted spills · 1399 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00191). Rainfall: EA Hydrology gauge 93daf755-8bd4-4ae4-b9d0-bcfbef4453c7_350533. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Poole Harbour Rivers Data.