← Lytchett Matravers Bulbury Lane

Spill evidence · River Hub

Lytchett Matravers Bulbury Lane

Pumping station overflow · WXW00210 · feeds BLACKHEATH STW
Wet weather

The discharge

Spill day
Tuesday, 16 December 2025
Started
16 Dec 2025, 20:26
Ended
16 Dec 2025, 21:02
Duration
36 minutes
Receiving water
Sherford River
Parish
Lytchett Minster and Upton

Rainfall evidence

Daily rainfall at the matched gauge (Alderney) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
16/12/2025 (spill day)0.14 mmdry
15/12/202514.26 mmrain
14/12/20250 mmdry
13/12/20250.01 mmdry
12/12/20250.21 mmdry

River flow that day: 23.822 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 10.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
49 counted spills · 467 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00210). Rainfall: EA Hydrology gauge e01eaf91-3a94-47d2-a987-d24706fec3bd. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Poole Harbour Rivers Data.