← Lydd Road Camber Ceo - 108279

Spill evidence · River Hub

Lydd Road Camber Ceo - 108279

Pumping station overflow · SWS00530 · feeds CAMBER
Wet weather

The discharge

Spill day
Friday, 16 January 2026
Started
16 Jan 2026, 03:17
Ended
16 Jan 2026, 03:41
Duration
24 minutes 11 seconds
Receiving water
Walland Marsh at East Guldeford
Parish
Camber

Rainfall evidence

Daily rainfall at the matched gauge (Denge Beach) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
16/01/2026 (spill day)1.6 mmrain
15/01/202616 mmrain
14/01/20262.4 mmrain
13/01/20267.8 mmrain
12/01/20260.8 mmrain

River flow that day: 10.522 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 10.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00530). Rainfall: EA Hydrology gauge 2752409e-2ea3-4318-bfa3-2e0707b75374. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Romney Marsh Data.