← Milford Road Pennington, - 115419
Spill evidence · River Hub
Milford Road Pennington, - 115419
Storm overflow at the works · SWS00656 · feeds LYMINGTON, PENNINGTON, NEW MILTON STW"
Dry spill
Evidence strength
High confidence- ✓ Long discharge (≥6 h)
- ✓ Dry across a 4-day antecedent window
- ✓ Rain gauge close (≤5 km)
The discharge
- Spill day
- Sunday, 1 March 2026
- Started
- 1 Mar 2026, 04:02
- Ended
- 2 Mar 2026, 02:33
- Duration
- 22 hours 31 minutes
- Receiving water
- —
- Parish
- Lymington and Pennington
Rainfall evidence
Daily rainfall at the matched gauge (Efford) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
| Date | Rainfall | |
|---|---|---|
| 01/03/2026 (spill day) | 0 mm | dry |
| 28/02/2026 | 0 mm | dry |
| 27/02/2026 | 0 mm | dry |
| 26/02/2026 | 0 mm | dry |
| 25/02/2026 | 0.1 mm | dry |
River flow that day: 10.432 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 2.6 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Lymington and Sowley; Pennington; Yarmouth
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00656). Rainfall: EA Hydrology gauge a53240b8-f458-4d19-b168-1f3dc4ae8523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.