← Milford Road Pennington, - 115419

Spill evidence · River Hub

Milford Road Pennington, - 115419

Storm overflow at the works · SWS00656 · feeds LYMINGTON, PENNINGTON, NEW MILTON STW"
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)

The discharge

Spill day
Sunday, 1 March 2026
Started
1 Mar 2026, 04:02
Ended
2 Mar 2026, 02:33
Duration
22 hours 31 minutes
Receiving water
—
Parish
Lymington and Pennington

Rainfall evidence

Daily rainfall at the matched gauge (Efford) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
01/03/2026 (spill day)0 mmdry
28/02/20260 mmdry
27/02/20260 mmdry
26/02/20260 mmdry
25/02/20260.1 mmdry

River flow that day: 10.432 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Lymington and Sowley; Pennington; Yarmouth
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00656). Rainfall: EA Hydrology gauge a53240b8-f458-4d19-b168-1f3dc4ae8523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.