← Milford Road Pennington, - 115419

Spill evidence · River Hub

Milford Road Pennington, - 115419

Storm overflow at the works · SWS00656 · feeds LYMINGTON, PENNINGTON, NEW MILTON STW"
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Sunday, 2 February 2025
Started
2 Feb 2025, 08:13
Ended
3 Feb 2025, 00:51
Duration
16 hours 38 minutes
Receiving water
—
Parish
Lymington and Pennington

Rainfall evidence

Daily rainfall at the matched gauge (Efford) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
02/02/2025 (spill day)0 mmdry
01/02/20250 mmdry
31/01/20250.01 mmdry
30/01/20258.77 mmrain
29/01/20257.15 mmrain

River flow that day: 10.077 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Lymington and Sowley; Pennington; Yarmouth
EA annual return (2025)
66 counted spills · 922 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00656). Rainfall: EA Hydrology gauge a53240b8-f458-4d19-b168-1f3dc4ae8523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.