← Peel Common, - 115425

Spill evidence · River Hub

Peel Common, - 115425

Storm overflow at the works · SWS00651 · feeds FAREHAM AND GOSPORT, HAMBLE, HEDGE END (PEEL COMMON) STW"
Wet weather

The discharge

Spill day
Friday, 19 December 2025
Started
19 Dec 2025, 10:48
Ended
19 Dec 2025, 13:16
Duration
2 hours 28 minutes
Receiving water
—
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Peel Common) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/12/2025 (spill day)0.04 mmdry
18/12/202523.44 mmrain
17/12/20258.11 mmrain
16/12/20250.4 mmrain
15/12/20250.62 mmrain

River flow that day: 21.894 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Lee-on-Solent; Stokes Bay
Shellfish water
Central Solent; Cowes and Medina; Ryde; Spithead and Stokes Bay
EA annual return (2025)
37 counted spills · 283 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00651). Rainfall: EA Hydrology gauge abb0cc5e-1e99-408b-aca4-d026aef724de. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.