← Spring Vale Ceo Pumped - 116281

Spill evidence · River Hub

Spring Vale Ceo Pumped - 116281

Pumping station overflow · SWS00806 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Wet weather

The discharge

Spill day
Wednesday, 27 November 2024
Started
27 Nov 2024, 03:09
Ended
27 Nov 2024, 05:24
Duration
2 hours 15 minutes
Receiving water
—
Parish
Nettlestone and Seaview

Rainfall evidence

Daily rainfall at the matched gauge (Ryde Vineyard) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/11/2024 (spill day)0.1 mmdry
26/11/202432.17 mmrain
25/11/20244.39 mmrain
24/11/202415.21 mmrain
23/11/202414.39 mmrain

River flow that day: 18.273 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Ryde; Seagrove; St Helens
Shellfish water
Ryde; Spithead and Stokes Bay; Cowes and Medina
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
2 counted spills · 5 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00806). Rainfall: EA Hydrology gauge eca2f09e-3951-48f1-b303-1e66c3097fde. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.
Spill evidence — Spring Vale Ceo Pumped - 116281 — Solent coast Data