← Norton Transfer Iow Pumped Ceo - 109524
Spill evidence · River Hub
Norton Transfer Iow Pumped Ceo - 109524
Pumping station overflow · SWS00622 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Wet weather
The discharge
- Spill day
- Thursday, 5 September 2024
- Started
- 5 Sept 2024, 12:36
- Ended
- 5 Sept 2024, 13:05
- Duration
- 28 minutes 33 seconds
- Receiving water
- —
- Parish
- Freshwater
Rainfall evidence
Daily rainfall at the matched gauge (Afton Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 05/09/2024 (spill day) | 36.43 mm | rain |
| 04/09/2024 | 1.23 mm | rain |
| 03/09/2024 | 0 mm | dry |
| 02/09/2024 | 1.79 mm | rain |
| 01/09/2024 | 2.88 mm | rain |
River flow that day: 3.75 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.4 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Colwell Bay; Totland Bay
- Shellfish water
- Lymington and Sowley; Pennington; Newtown; Yarmouth
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 91 counted spills · 470 h total
- Monitor uptime (2024)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00622). Rainfall: EA Hydrology gauge 5e45b2c5-20ea-4e7f-b37a-a9b220ba3946_334158. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.