← Norton Transfer Iow Pumped Ceo - 109524

Spill evidence · River Hub

Norton Transfer Iow Pumped Ceo - 109524

Pumping station overflow · SWS00622 · feeds SANDOWN, VENTNOR,BEMBRIDGE STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Monday, 12 February 2024
Started
12 Feb 2024, 18:30
Ended
12 Feb 2024, 19:56
Duration
1 hour 26 minutes
Receiving water
—
Parish
Freshwater

Rainfall evidence

Daily rainfall at the matched gauge (Afton Park) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
12/02/2024 (spill day)0.23 mmdry
11/02/20240.01 mmdry
10/02/20240.75 mmrain
09/02/20246.18 mmrain
08/02/202418.9 mmrain

River flow that day: 13.946 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Colwell Bay; Totland Bay
Shellfish water
Lymington and Sowley; Pennington; Newtown; Yarmouth
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
91 counted spills · 470 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00622). Rainfall: EA Hydrology gauge 5e45b2c5-20ea-4e7f-b37a-a9b220ba3946_334158. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Solent coast Data.