← Cambridge Lane, Plymouth

Spill evidence · River Hub

Cambridge Lane, Plymouth

Combined sewer overflow · SBB00203 · feeds PLYMOUTH CENTRAL STW
Dry spill

Evidence strength

High confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Monitor 90% operational that year

The discharge

Spill day
Saturday, 27 April 2024
Started
27 Apr 2024, 01:25
Ended
27 Apr 2024, 09:20
Duration
7 hours 54 minutes
Receiving water
Cotehele Stream
Parish
Maker-with-Rame

Rainfall evidence

Daily rainfall at the matched gauge (Torpoint) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
27/04/2024 (spill day)0 mmdry
26/04/20240 mmdry
25/04/20240 mmdry
24/04/20240 mmdry
23/04/20240 mmdry

River flow that day: 5.303 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Plymouth Hoe West
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
91 counted spills · 465 h total
Monitor uptime (2024)
90% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00203). Rainfall: EA Hydrology gauge c89cc787-ab14-4a15-8b22-e5ad8bc83429. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Tamar & Inny Data.