← Cambridge Lane, Plymouth
Spill evidence · River Hub
Cambridge Lane, Plymouth
Combined sewer overflow · SBB00203 · feeds PLYMOUTH CENTRAL STW
Dry spill
Evidence strength
Medium confidence- ✓ Dry across a 4-day antecedent window
- ✓ Monitor 90% operational that year
- ⚠ Short discharge (<1 h) — weaker signal
The discharge
- Spill day
- Thursday, 9 May 2024
- Started
- 9 May 2024, 20:19
- Ended
- 9 May 2024, 20:44
- Duration
- 25 minutes 20 seconds
- Receiving water
- Cotehele Stream
- Parish
- Maker-with-Rame
Rainfall evidence
Daily rainfall at the matched gauge (Torpoint) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
| Date | Rainfall | |
|---|---|---|
| 09/05/2024 (spill day) | 0 mm | dry |
| 08/05/2024 | 0 mm | dry |
| 07/05/2024 | 0 mm | dry |
| 06/05/2024 | 0 mm | dry |
| 05/05/2024 | 0 mm | dry |
River flow that day: 3.563 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 5.5 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Plymouth Hoe West
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
- EA annual return (2024)
- 91 counted spills · 465 h total
- Monitor uptime (2024)
- 90% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00203). Rainfall: EA Hydrology gauge c89cc787-ab14-4a15-8b22-e5ad8bc83429. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Lower Tamar & Inny Data.