← Torrington Street pumping station, Bideford

Spill evidence · River Hub

Torrington Street pumping station, Bideford

Pumping station overflow · SBB01261 · feeds BIDEFORD/NORTHAM STW
Wet weather

The discharge

Spill day
Thursday, 8 January 2026
Started
8 Jan 2026, 21:21
Ended
8 Jan 2026, 22:35
Duration
1 hour 14 minutes
Receiving water
Newton Tracey Stream
Parish
Bideford

Rainfall evidence

Daily rainfall at the matched gauge (Kenwith Castle) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/01/2026 (spill day)22.4 mmrain
07/01/20260.7 mmrain
06/01/20262.8 mmrain
05/01/20260 mmdry
04/01/20260.5 mmrain

River flow that day: 16.583 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Taw-Torridge Estuary
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01261). Rainfall: EA Hydrology gauge c21f6669-06ec-44b9-864e-ff939c22aaa2_390523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Taw Data.