← Westleigh pumping station, Bideford

Spill evidence · River Hub

Westleigh pumping station, Bideford

Pumping station overflow · SBB01351 · feeds BIDEFORD/NORTHAM STW
Wet weather

The discharge

Spill day
Thursday, 4 January 2024
Started
4 Jan 2024, 20:01
Ended
4 Jan 2024, 20:30
Duration
28 minutes 50 seconds
Receiving water
Taw Estuary
Parish
Westleigh

Rainfall evidence

Daily rainfall at the matched gauge (Kenwith Castle) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
04/01/2024 (spill day)6.9 mmrain
03/01/20246.5 mmrain
02/01/202410.8 mmrain
01/01/202425.1 mmrain
31/12/20234.4 mmrain

River flow that day: 41.808 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
34 counted spills · 405 h total
Monitor uptime (2024)
99% operational

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01351). Rainfall: EA Hydrology gauge c21f6669-06ec-44b9-864e-ff939c22aaa2_390523. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Taw Data.