← West Milton Inlet

Spill evidence · River Hub

West Milton Inlet

Storm overflow at the works · WXW01224 · feeds WEST MILTON STW CATCHMENT
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry across a 3-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 91% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Tuesday, 25 June 2024
Started
25 Jun 2024, 07:38
Ended
25 Jun 2024, 08:36
Duration
58 minutes
Receiving water
Mangerton Brook
Parish
Powerstock

Rainfall evidence

Daily rainfall at the matched gauge (Beaminster Coombe Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Wet weather
DateRainfall
25/06/2024 (spill day)0 mmdry
24/06/20240.18 mmdry
23/06/20240 mmdry
22/06/20240 mmdry
21/06/20241.42 mmrain

River flow that day: 1.249 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
23 counted spills · 71 h total
Monitor uptime (2024)
91% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW01224). Rainfall: EA Hydrology gauge dd83b9ea-defb-449d-b475-4604ca54044a. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by West Dorset Rivers Data.