← Swanage Herston Cross Attenuation Tank
Spill evidence · River Hub
Swanage Herston Cross Attenuation Tank
Combined sewer overflow · WXW00528 · feeds SWANAGE STW
Wet weather
The discharge
- Spill day
- Wednesday, 18 February 2026
- Started
- 18 Feb 2026, 17:28
- Ended
- 18 Feb 2026, 21:24
- Duration
- 3 hours 56 minutes
- Receiving water
- Swan (Swanage)
- Parish
- Swanage
Rainfall evidence
Daily rainfall at the matched gauge (Swanage) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 18/02/2026 (spill day) | 21.06 mm | rain |
| 17/02/2026 | 2 mm | rain |
| 16/02/2026 | 0 mm | dry |
| 15/02/2026 | 9.27 mm | rain |
| 14/02/2026 | 8.05 mm | rain |
River flow that day: 31.861 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 1.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Swanage Central
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00528). Rainfall: EA Hydrology gauge f7f930bb-d6b3-4e82-8eb4-8486a8fd8397. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by West Dorset Rivers Data.