← Hollands Road Henfield Ceo - 107409

Spill evidence · River Hub

Hollands Road Henfield Ceo - 107409

Pumping station overflow · SWS00441 · feeds HENFIELD STW
No rain data

The discharge

Spill day
Friday, 13 March 2026
Started
13 Mar 2026, 02:36
Ended
13 Mar 2026, 03:40
Duration
1 hour 4 minutes
Receiving water
Woodsmill Stream
Parish
Henfield

Rainfall evidence

Daily rainfall at the matched gauge for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
13/03/2026 (spill day)no data
12/03/2026no data
11/03/2026no data
10/03/2026no data
09/03/2026no data

River flow that day: 10.547 m³/s.

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00441). Rainfall: EA Hydrology (no gauge matched). A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Adur Data.