What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SO102401 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Ashington WTW | Due 2026-27 | Honeybridge Stream |
| 08SO102677 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ASHINGTON WWTW | Due 2026-27 | Honeybridge Stream |
| 08SO102404 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Barns Green WTW | Due 2026-27 | BARNS GREEN |
| 08SO102681 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BARNS GREEN WWTW | Due 2026-27 | Adur West |
| 08SO102427 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Cowfold WTW | Due 2026-27 | COWFOLD |
| 08SO102723 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor COWFOLD WWTW | Due 2026-27 | Cowfold Stream |
| 08SO102428 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Ditchling WTW | Due 2026-27 | DITCHLING |
| 08SO102488 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Goddards Green WTW | Due 2026-27 | Adur East (Goddards Green) |
| 08SO102758 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor GODDARDS GREEN WWTW | Due 2026-27 | Adur East (Goddards Green) |
| 08SO102779 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HENFIELD WWTW | Due 2026-27 | Chess Stream |
| 08SO102477 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Monks Gate WTW | Due 2026-27 | MONKS GATE |
| 08SO102819 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor MONKS GATE WWTW | Due 2026-27 | Blakes Gill |
| 08SO102826 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor NEWBURY LANE CUCKFIELD WWTW | Due 2026-27 | Copyhold Stream |
| 08SO102836 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PARTRIDGE GREEN WWTW | Due 2026-27 | Adur East (Sakeham) |
| 08SO102484 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Small Dole WTW | Due 2026-27 | SMALL DOLE |
| 08SO102878 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SMALL DOLE WWTW | Due 2026-27 | Woodsmill Stream |
| 08SO102588 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils STEYNING WTW | Due 2026-27 | Black Sewer |
| 08SO102890 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STEYNING WWTW | Due 2026-27 | Black Sewer |
| 08SO102599 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Wivelsfield WTW | Due 2026-27 | WIVELSFIELD |
| 08SO102933 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WIVELSFIELD WWTW | Due 2026-27 | Adur (Burgess Hill) |
| 08SO101069 · b | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Burgess Hill (Goddards Green) | Due 2026-27 | Adur (Burgess Hill) |
| 08SO103792 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. ANSTY WTW | Due 2027-28 | Adur East (Goddards Green) |
| 08SO104950 · ow | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact ASHINGTON SSO | Due 2027-28 | Honeybridge Stream |
| 08SO103794 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. BARNS GREEN WTW | Due 2027-28 | BARNS GREEN |
| 08SO103796 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. COOLHAM WTW | Due 2027-28 | Adur West |
| 08SO104950 · rg | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CUCKFIELD ROAD HURSTPIERPOINT CEO | Due 2027-28 | Herrings Stream |
| 08SO104950 · ro | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CUCKFIELD ROAD HURSTPIERPOINT CSO | Due 2027-28 | Herrings Stream |
| 08SO104950 · ri | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FAIRPLACE HILL BURGESS HILL CEO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO104950 · rr | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FOXHILL HAYWARDS HEATH CEO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO104950 · sa | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FREEKS LANE BURGESS HILL CSO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO104950 · oo | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GODDARDS GREEN SSO | Due 2027-28 | Adur East (Goddards Green) |
| 08SO104026 · a | WFD_INV | Investigation | Investigate the cause of the spills Goddards Green WTW WFD_INV | Due 2027-28 | Adur East (Goddards Green) |
| 08SO104950 · rs | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact LONDON ROAD BEXHILL CSO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO104950 · qz | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact MALTHOUSE LANE BURGESS HILL CEO | Due 2027-28 | Herrings Stream |
| 08SO104950 · ov | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact MONKS GATE SSO | Due 2027-28 | Blakes Gill |
| 08SO104950 · ce | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact POYNINGS SSO | Due 2027-28 | Woodsmill Stream |
| 08SO104950 · rl | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact RUMBOLDS LANE HAYWARDS HEATH CSO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO103817 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. SHIPLEY WTW | Due 2027-28 | Adur West |
| 08SO104950 · px | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact SMALL DOLE SSO | Due 2027-28 | Woodsmill Stream |
| 08SO104950 · qv | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact WILLOW WAY HURSTPIERPOINT CSO | Due 2027-28 | Herrings Stream |
| 08SO104950 · qe | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact WIVELSFIELD SSO | Due 2027-28 | Adur (Burgess Hill) |
| 08SO103823 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. WIVELSFIELD WTW | Due 2027-28 | WIVELSFIELD |
| 08SO103902 · a | EnvAct_IMP2 | Improvement | SuDS + Storage ASHINGTON SSO | Due 2029-30 | Honeybridge Stream |
| 08SO104071 · a | WFD_IMPg | Improvement | Amend Total P permit BARNS GREEN | Due 2029-30 | BARNS GREEN |
| 08SO101069 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Burgess Hill (Goddards Green) | Due 2029-30 | Adur (Burgess Hill) |
| 08SO101069 · c | WFD_ND_CHEM4 | No deterioration | Prevent any deterioration Burgess Hill (Goddards Green) | Due 2029-30 | Adur (Burgess Hill) |
| 08SO104076 · a | WFD_IMPg | Improvement | Amend Total P permit COOLHAM | Due 2029-30 | Adur West |
| 08SO104078 · a | WFD_IMPm | Improvement | Amend Total P permit COWFOLD | Due 2029-30 | COWFOLD |
| 08SO103247 · a | EnvAct_IMP2 | Improvement | SuDS + Storage CUCKFIELD ROAD HURSTPIERPOINT CEO | Due 2029-30 | Herrings Stream |
| 08SO103266 · a | EnvAct_IMP2 | Improvement | SuDS + Storage CUCKFIELD ROAD HURSTPIERPOINT CSO | Due 2029-30 | Herrings Stream |
| 08SO104799 · a | WFD_IMPg | Improvement | Amend Total P permit limit Dial Post | Due 2029-30 | Adur (Lancing brook) |
| 08SO104081 · a | WFD_IMPm | Improvement | Amend Total P permit DITCHLING | Due 2029-30 | DITCHLING |
| 08SO103252 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FAIRPLACE HILL BURGESS HILL CEO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO103270 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FOXHILL HAYWARDS HEATH CEO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO103287 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FREEKS LANE BURGESS HILL CSO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO104034 · b | WFD_ND | No deterioration | Amend WFD ND BOD permit HENFIELD | Due 2029-30 | Chess Stream |
| 08SO104034 · a | WFD_ND | No deterioration | Amend WFD ND Ammonia permit HENFIELD | Due 2029-30 | Chess Stream |
| 08SO104800 · a | WFD_IMPg | Improvement | Amend Total P permit limit Itchingfield | Due 2029-30 | Adur West |
| 08SO104800 · b | U_IMP1 | Improvement | Replace descriptive with numerical BOD and SS permits Itchingfield WTW | Due 2029-30 | Adur West |
| 08SO103932 · a | EnvAct_IMP2 | Improvement | SuDS + Storage LONDON ROAD BEXHILL CSO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO104087 · a | WFD_IMPg | Improvement | Amend Total P permit LOWER BEEDING | Due 2029-30 | Cowfold Stream |
| 08SO103966 · a | EnvAct_IMP2 | Improvement | SuDS + Storage MALTHOUSE LANE BURGESS HILL CEO | Due 2029-30 | Herrings Stream |
| 08SO104039 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit NEWBURY LANE CUCKFIELD WTW | Due 2029-30 | Copyhold Stream |
| 08SO104019 · a | WFD_IMPg | Improvement | Amend Total P permit PARTRIDGE GREEN | Due 2029-30 | Adur East (Sakeham) |
| 08SO103261 · a | EnvAct_IMP2 | Improvement | SuDS + Storage RUMBOLDS LANE HAYWARDS HEATH CSO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO104099 · a | WFD_IMPg | Improvement | Amend Total P permit SHIPLEY | Due 2029-30 | Adur West |
| 08SO104099 · b | U_IMP1 | Improvement | Replace descriptive with numerical BOD and SS permits Shipley WTW | Due 2029-30 | Adur West |
| 08SO103916 · a | EnvAct_IMP2 | Improvement | SuDS + Storage SMALL DOLE SSO | Due 2029-30 | Woodsmill Stream |
| 08SO104101 · a | WFD_IMPm | Improvement | Amend Total P permit STEYNING | Due 2029-30 | Black Sewer |
| 08SO103943 · a | EnvAct_IMP2 | Improvement | SuDS + Storage WILLOW WAY HURSTPIERPOINT CSO | Due 2029-30 | Herrings Stream |
| 08SO103919 · a | EnvAct_IMP2 | Improvement | SuDS + Storage WIVELSFIELD SSO | Due 2029-30 | Adur (Burgess Hill) |
| 08SO103901 · a | EnvAct_IMP2 | Improvement | Wetland + Lining MONKS GATE SSO | Due 2034-35 | Blakes Gill |
72 of 72 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.