← Hollands Road Henfield Ceo - 107409
Spill evidence · River Hub
Hollands Road Henfield Ceo - 107409
Pumping station overflow · SWS00441 · feeds HENFIELD STW
No rain data
The discharge
- Spill day
- Wednesday, 29 October 2025
- Started
- 29 Oct 2025, 14:17
- Ended
- 29 Oct 2025, 15:11
- Duration
- 53 minutes 37 seconds
- Receiving water
- Woodsmill Stream
- Parish
- Henfield
Rainfall evidence
Daily rainfall at the matched gauge for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 29/10/2025 (spill day) | no data | |
| 28/10/2025 | no data | |
| 27/10/2025 | no data | |
| 26/10/2025 | no data | |
| 25/10/2025 | no data |
River flow that day: 2.552 m³/s.
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2025)
- 40 counted spills · 206 h total
- Monitor uptime (2025)
- 100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00441). Rainfall: EA Hydrology (no gauge matched). A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Adur Data.