What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SO102511 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Billingshurst WTW | Due 2026-27 | Arun (U/S Pallingham) |
| 08SO102691 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BILLINGSHURST WWTW | Due 2026-27 | Arun (U/S Pallingham) |
| 08SO102697 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BRIDGEFOOT KIRDFORD WPS | Due 2026-27 | Kird |
| 08SO102424 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Buriton WTW | Due 2026-27 | BURITON |
| 08SO102702 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BURITON WWTW | Due 2026-27 | Stanbridge Stream |
| 08SO102410 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Bury WTW | Due 2026-27 | BURY |
| 08SO102412 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Chiddingfold WTW | Due 2026-27 | Loxwood Stm-Hambledon Trb |
| 08SO102717 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor CHIDDINGFOLD WWTW | Due 2026-27 | Loxwood Stm-Hambledon Trb |
| 08SO102558 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils COLDWALTHAM WTW | Due 2026-27 | COLDWALTHAM |
| 08SO102430 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Fernhurst WTW | Due 2026-27 | FERNHURST |
| 08SO102745 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FERNHURST WWTW | Due 2026-27 | Lod |
| 08SO102560 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils FITTLEWORTH WTW | Due 2026-27 | FITTLEWORTH |
| 08SO102747 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor FITTLEWORTH WWTW | Due 2026-27 | Western Rother |
| 08SO102489 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Grayswood WTW | Due 2026-27 | GRAYSWOOD |
| 08SO102764 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor GRAYSWOOD WWTW | Due 2026-27 | Loxwood/Chiddingfold Trib |
| 08SO102491 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Horsham New WTW | Due 2026-27 | Arun Horsham |
| 08SO102781 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HORSHAM NEW WWTW | Due 2026-27 | Arun Horsham |
| 08SO102518 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Liss WTW | Due 2026-27 | LISS SSO - 115920 |
| 08SO102797 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LISS WWTW | Due 2026-27 | LISS SSO - 115920 |
| 08SO102473 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Loxwood WTW | Due 2026-27 | Loxwood Stream |
| 08SO102798 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor LOXWOOD WWTW | Due 2026-27 | Loxwood Stream |
| 08SO102494 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Lurgashall WTW | Due 2026-27 | LURGASHALL |
| 08SO102800 · a | U_MON3 | Monitoring | U_MON3b: MCERTS certified overflow operation monitor LURGASHALL WWTW | Due 2026-27 | Lod |
| 08SO102475 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Mannings Heath WTW | Due 2026-27 | MANNINGS HEATH |
| 08SO102806 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor MANNINGS HEATH WWTW | Due 2026-27 | Arun Source |
| 08SO102496 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Northchapel WTW | Due 2026-27 | Kird |
| 08SO102830 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor NORTHCHAPEL WWTW | Due 2026-27 | Kird |
| 08SO102438 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Petersfield WTW | Due 2026-27 | Stanbridge Stream |
| 08SO102841 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PETERSFIELD WWTW | Due 2026-27 | Stanbridge Stream |
| 08SO102842 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor PETWORTH WWTW | Due 2026-27 | Loxwood Stm-Hambledon Trb |
| 08SO102482 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Pulborough WTW | Due 2026-27 | Chilt |
| 08SO102613 · a | EPR_MON1 | Monitoring | Install MCERTS certified WTW (water treatment works) Total daily volume flow/max flow rate monitoring for the first time at (WSW) water supply works Rogate WSW | Due 2026-27 | Western Rother Durford |
| 08SO102498 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Rogate WTW | Due 2026-27 | ROGATE |
| 08SO102858 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ROGATE WWTW | Due 2026-27 | Western Rother |
| 08SO102862 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor RUDGWICK RECREATION GROUND WPS | Due 2026-27 | Arun (U/S Pallingham) |
| 08SO102501 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Slinfold WTW | Due 2026-27 | SLINFOLD |
| 08SO102876 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SLINFOLD WWTW | Due 2026-27 | Arun (U/S Pallingham) |
| 08SO102522 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils South Ambersham WTW | Due 2026-27 | Western Rother |
| 08SO102881 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SOUTH AMBERSHAM WWTW | Due 2026-27 | Western Rother |
| 08SO102502 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring South Harting WTW | Due 2026-27 | SOUTH HARTING |
| 08SO102882 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SOUTH HARTING WWTW | Due 2026-27 | Elsted Stream |
| 08SO102526 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Storrington WTW | Due 2026-27 | Stor |
| 08SO102895 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor STORRINGTON WWTW | Due 2026-27 | Stor |
| 08SO102508 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Wisborough Green WTW | Due 2026-27 | WISBOROUGH GREEN |
| 08SO102931 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WISBOROUGH GREEN WWTW | Due 2026-27 | Kird |
| 08SO101096 · b | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Billingshurst WTW | Due 2026-27 | Arun (U/S Pallingham) |
| 08SO101083 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Horsham WTW | Due 2026-27 | Arun Horsham |
| 08SO104950 · ot | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact BARNETTS BRIDGE GRAFFHAM CEO | Due 2027-28 | Western Rother |
| 08SO104950 · qp | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact BILLINGSHURST SSO | Due 2027-28 | Arun (U/S Pallingham) |
| 08SO104950 · qa | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact BURITON CEO | Due 2027-28 | Stanbridge Stream |
| 08SO104950 · ox | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CHIDDINGFOLD SSO | Due 2027-28 | Loxwood Stm-Hambledon Trb |
| 08SO104028 · a | WFD_INV | Investigation | Investigate the cause of the spills Fernhurst WTW WFD_INV | Due 2027-28 | Lod |
| 08SO104950 · on | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact FITTLEWORTH SSO | Due 2027-28 | Western Rother |
| 08SO104950 · qm | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact GRAYSWOOD CSO | Due 2027-28 | Loxwood/Chiddingfold Trib |
| 08SO104950 · qt | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact LOXWOOD SSO | Due 2027-28 | Loxwood Stream |
| 08SO103808 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. LOXWOOD WTW | Due 2027-28 | Loxwood Stream |
| 08SO103810 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. LURGASHALL WTW | Due 2027-28 | LURGASHALL |
| 08SO104950 · qd | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact PETERSFIELD SSO | Due 2027-28 | Stanbridge Stream |
| 08SO102617 · a | WFD_INV_N-Tal | Investigation | Investigation to assess treatment options for nitrogen. Pilot, Nutrem Petersfield WTW | Due 2027-28 | Stanbridge Stream |
| 08SO104950 · rd | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact PETWORTH CSO | Due 2027-28 | Western Rother |
| 08SO104950 · ph | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact SLINFOLD SSO | Due 2027-28 | Arun (U/S Pallingham) |
| 08SO101096 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Billingshurst WTW | Due 2029-30 | Arun (U/S Pallingham) |
| 08SO103917 · a | EnvAct_IMP2 | Improvement | Wetland + Lining BURITON CEO | Due 2029-30 | Stanbridge Stream |
| 08SO104056 · a | WFD_IMP_MOD | Improvement | Amend P permit level - P removal CHIDDINGFOLD | Due 2029-30 | Loxwood Stm-Hambledon Trb |
| 08SO103903 · a | EnvAct_IMP2 | Improvement | SuDS + Storage CHIDDINGFOLD SSO | Due 2029-30 | Loxwood Stm-Hambledon Trb |
| 08SO104049 · a | WFD_ND | No deterioration | Amend Total P permit CLAPHAM | Due 2029-30 | Black Ditch (W Sussex) |
| 08SO104083 · a | WFD_IMPm | Improvement | Amend Total P permit FERNHURST | Due 2029-30 | FERNHURST |
| 08SO104035 · a | WFD_ND | No deterioration | Amend WFD ND Ammonia permit HORSHAM NEW | Due 2029-30 | Arun Horsham |
| 08SO104085 · a | WFD_IMPg | Improvement | Amend Total P permit KIRDFORD | Due 2029-30 | KIRDFORD |
| 08SO100034 · a | WFD_ND_WRFlow | No deterioration | The AMP7 Hardham sustainability investigation will determine the requirement for an AMP8 ecological resilience scheme, focused on in-river enhancements to individual reaches of the Lancing Brook and Hammer Stream. These enhancements would be to provide ecological resilience, for example by removing backwater effects, and improving fish passage. Lancing Brook & Hammer Stream WFD ecological resilience scheme | Due 2029-30 | Hammer Stream (W. Sussex) |
| 08SO104710 · a | EnvAct_IMP1 | Improvement | Amend total P permit Liss | Due 2029-30 | LISS SSO - 115920 |
| 08SO103924 · a | EnvAct_IMP2 | Improvement | SuDS + Storage LOXWOOD SSO | Due 2029-30 | Loxwood Stream |
| 08SO104088 · a | WFD_IMPg | Improvement | Amend Total P permit LURGASHALL | Due 2029-30 | LURGASHALL |
| 08SO104088 · b | U_IMP1 | Improvement | Replace descriptive with numerical BOD and SS permits Lurgashall WTW | Due 2029-30 | LURGASHALL |
| 08SO103939 · a | EnvAct_IMP2 | Improvement | SuDS + Storage PETERSFIELD SSO | Due 2029-30 | Stanbridge Stream |
| 08SO104094 · a | WFD_IMPg | Improvement | Amend Total P permit PETWORTH | Due 2029-30 | Haslingbourne Stream |
| 08SO104097 · a | WFD_IMPg | Improvement | Amend Total P permit ROGATE | Due 2029-30 | ROGATE |
| 08SO103908 · a | EnvAct_IMP2 | Improvement | Preferred option is SuDS and storage, but the costs are based on storage only SLINFOLD SSO | Due 2029-30 | Arun (U/S Pallingham) |
| 08SO104102 · a | WFD_IMPg | Improvement | Amend Total P permit TILLINGTON | Due 2029-30 | Western Rother |
| 08SO104107 · a | WFD_IMPg | Improvement | Amend Total P permit WISBOROUGH GREEN | Due 2029-30 | WISBOROUGH GREEN |
| 08SO103961 · a | EnvAct_IMP2 | Improvement | Wetland + Lining BARNETTS BRIDGE GRAFFHAM CEO | Due 2034-35 | Western Rother |
| 08SO103922 · a | EnvAct_IMP2 | Improvement | SuDS + Storage BILLINGSHURST SSO | Due 2034-35 | Arun (U/S Pallingham) |
| 08SO103935 · a | EnvAct_IMP2 | Improvement | SuDS + Storage FITTLEWORTH SSO | Due 2034-35 | Western Rother |
| 08SO103945 · a | EnvAct_IMP2 | Improvement | SuDS + Storage PETWORTH CSO | Due 2034-35 | Western Rother |
| 08SO103949 · a | EnvAct_IMP4 | Improvement | Wetland + Lining SOUTH HARTING SSO | Due 2034-35 | Elsted Stream |
85 of 85 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.