← Moreleigh STW

Spill evidence · River Hub

Moreleigh STW

Storm overflow at the works · SBB00804 · feeds MORELEIGH_STW_MORELEIGH
Dry spill

Evidence strength

Low confidence
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)

The discharge

Spill day
Thursday, 26 November 2026
Started
26 Nov 2026, 06:51
Ended
ongoing
Duration
—
Receiving water
Torr Bk
Parish
Halwell and Moreleigh

Rainfall evidence

Daily rainfall at the matched gauge (Harbertonford Slipperstone) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/11/2026 (spill day)0 mmdry
25/11/20260 mmdry
24/11/20260 mmdry
23/11/20262.96 mmrain
22/11/202637.04 mmrain

River flow that day: 5.635 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00804). Rainfall: EA Hydrology gauge 8d954129-924c-47e3-8750-5f29a59617b2. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.