Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

20
Measures in this catchment
WINEP, current record
20
Still active
not yet past their date
0
Assumed complete
completion date has passed
5
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SW104906 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
CHILLINGTON + FROGMORE STW
Due 2026-27Avon (DevonTidal) and Sth Hams - Frogmore
08SW104905 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
CHILLINGTON + FROGMORE STW
Due 2026-27Avon (DevonTidal) and Sth Hams - Frogmore
08SW104856 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
EAST ALLINGTON STW
Due 2026-27Small Bk
08SW104857 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
EAST ALLINGTON STW
Due 2026-27Small Bk
08SW104745 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Loddiswell STW
Due 2026-27Avon - Lower
08SW104746 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Loddiswell STW
Due 2026-27Avon - Lower
08SW104634 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
South Brent STW
Due 2026-27Avon - Upper
08SW104633 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
South Brent STW
Due 2026-27Avon - Upper
08SW100020 · bWFD_NDINV_WRHMWBInvestigation
Investigation to assess whether current compensation flow poses a risk to deterioration in the downstream waterbody.
Upper Avon
Due 2026-27Upper Avon
08SW100058 · aHD_INVInvestigation
Investigation into the effect of an effluent recycling scheme
Christchurch WRC and Holdenhurst WRC effluent recycling scheme
Due 2027-28Avon - Lower
08SW104999 · cvEnvAct_INV4Investigation
Investigation to meet EnvAct INV4 Driver
NORTH SANDS SPST_PSCSOEO_SALCOMBE
Due 2027-28NORTH SANDS SPST_PSCSOEO_SALCOMBE
08SW100503 · aSW_NDNo deterioration
10 Spills 50m3 aggregated
CHILLINGTON SPS_PSCSOEO_CHILLINGTON
Due 2027-28CHILLINGTON SPS_PSCSOEO_CHILLINGTON
08SW100503 · cSW_NDNo deterioration
10 Spills 50m3 aggregated
CHILLINGTON STW_SSO_CHILLINGTON
Due 2027-28CHILLINGTON STW_SSO_CHILLINGTON
08SW100503 · dSW_NDNo deterioration
10 Spills 50m3 aggregated
MEADOWSIDE CHILLINGTON_CSO
Due 2027-28MEADOWSIDE CHILLINGTON_CSO
08SW100503 · eSW_NDNo deterioration
10 Spills 50m3 aggregated
SHERFORD STW_SO_SHERFORD
Due 2027-28SHERFORD STW_SO_SHERFORD
08SW101455 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
COMMINUTOR HOUSE GOULD RD_CSO_SALCOMBE
Due 2029-30COMMINUTOR HOUSE GOULD RD_CSO_SALCOMBE
08SW101466 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
DITCH END S T_PSCSOEO_EAST PORTLEMOUTH
Due 2029-30DITCH END S T_PSCSOEO_EAST PORTLEMOUTH
08SW101565 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
NORTH SANDS SPST_PSCSOEO_SALCOMBE
Due 2029-30NORTH SANDS SPST_PSCSOEO_SALCOMBE
08SW101308 · aEnvAct_IMP2Improvement
Reduction of spills to meet EnvAct_IMP drivers
SHADYCOMBE TANK_CSOEO_SALCOMBE
Due 2029-30SHADYCOMBE TANK_CSOEO_SALCOMBE
08SW101611 · aEnvAct_IMP3Improvement
Reduction of spills to meet EnvAct_IMP drivers
SHADYCOMBE TK LOWER TUNNELS_CSO_SALCOMBE
Due 2029-30SHADYCOMBE TK LOWER TUNNELS_CSO_SALCOMBE

20 of 20 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.