← Chillington STW

Spill evidence · River Hub

Chillington STW

Storm overflow at the works · SBB00244 · feeds CHILLINGTON_STW_CHILLINGTON
No rain data

The discharge

Spill day
Tuesday, 16 December 2025
Started
16 Dec 2025, 20:41
Ended
16 Dec 2025, 21:52
Duration
1 hour 11 minutes
Receiving water
Avon (DevonTidal) and Sth Hams - Frogmore
Parish
Frogmore and Sherford

Rainfall evidence

Daily rainfall at the matched gauge (Davey Park Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
16/12/2025 (spill day)no data
15/12/2025no data
14/12/2025no data
13/12/2025no data
12/12/2025no data

River flow that day: 23.822 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Salcombe
EA annual return (2025)
28 counted spills · 284 h total
Monitor uptime (2025)
100% operational

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00244). Rainfall: EA Hydrology gauge f37a0c9e-b91e-4ace-90bb-7d35af3855b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.
Spill evidence — Chillington STW — South Devon Avon Data