← Chillington STW
Spill evidence · River Hub
Chillington STW
Storm overflow at the works · SBB00244 · feeds CHILLINGTON_STW_CHILLINGTON
No rain data
The discharge
- Spill day
- Tuesday, 16 December 2025
- Started
- 16 Dec 2025, 20:41
- Ended
- 16 Dec 2025, 21:52
- Duration
- 1 hour 11 minutes
- Receiving water
- Avon (DevonTidal) and Sth Hams - Frogmore
- Parish
- Frogmore and Sherford
Rainfall evidence
Daily rainfall at the matched gauge (Davey Park Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 16/12/2025 (spill day) | no data | |
| 15/12/2025 | no data | |
| 14/12/2025 | no data | |
| 13/12/2025 | no data | |
| 12/12/2025 | no data |
River flow that day: 23.822 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 7.4 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Salcombe
- EA annual return (2025)
- 28 counted spills · 284 h total
- Monitor uptime (2025)
- 100% operational
⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00244). Rainfall: EA Hydrology gauge f37a0c9e-b91e-4ace-90bb-7d35af3855b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.