← Sherford STW

Spill evidence · River Hub

Sherford STW

Storm overflow at the works · SBB01077 · feeds SHERFORD_STW_SHERFORD
No rain data

The discharge

Spill day
Thursday, 3 December 2020
Started
3 Dec 2020, 08:41
Ended
3 Dec 2020, 09:36
Duration
55 minutes 18 seconds
Receiving water
Avon (DevonTidal) and Sth Hams - Frogmore
Parish
Frogmore and Sherford

Rainfall evidence

Daily rainfall at the matched gauge (Davey Park Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
03/12/2020 (spill day)no data
02/12/2020no data
01/12/2020no data
30/11/2020no data
29/11/2020no data

River flow that day: 5.816 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Salcombe

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB01077). Rainfall: EA Hydrology gauge f37a0c9e-b91e-4ace-90bb-7d35af3855b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.