← Comminutor House Gould Rd, Salcombe

Spill evidence · River Hub

Comminutor House Gould Rd, Salcombe

Combined sewer overflow · SBB00298 · feeds MALBOROUGH STW
Wet weather

The discharge

Spill day
Friday, 27 November 2026
Started
27 Nov 2026, 07:33
Ended
27 Nov 2026, 07:50
Duration
17 minutes 24 seconds
Receiving water
Avon (DevonTidal) and Sth Hams - Frogmore
Parish
Salcombe

Rainfall evidence

Daily rainfall at the matched gauge (Davey Park Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
27/11/2026 (spill day)2.01 mmrain
26/11/20267.41 mmrain
25/11/20260 mmdry
24/11/20260 mmdry
23/11/20262.23 mmrain

River flow that day: 5.306 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Mill Bay
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00298). Rainfall: EA Hydrology gauge f37a0c9e-b91e-4ace-90bb-7d35af3855b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.