← Meadowside Chillington

Spill evidence · River Hub

Meadowside Chillington

Combined sewer overflow · SBB00246 · feeds CHILLINGTON_STW_CHILLINGTON
No rain data

The discharge

Spill day
Sunday, 26 January 2025
Started
26 Jan 2025, 20:00
Ended
26 Jan 2025, 20:28
Duration
28 minutes
Receiving water
Avon (DevonTidal) and Sth Hams - Frogmore
Parish
Stokenham

Rainfall evidence

Daily rainfall at the matched gauge (Davey Park Farm) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
26/01/2025 (spill day)no data
25/01/2025no data
24/01/2025no data
23/01/2025no data
22/01/2025no data

River flow that day: 45.11 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Salcombe
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
25 counted spills · 14 h total
Monitor uptime (2025)
100% operational

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00246). Rainfall: EA Hydrology gauge f37a0c9e-b91e-4ace-90bb-7d35af3855b5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by South Devon Avon Data.