← Clapton pumping station, Crewkerne

Spill evidence · River Hub

Clapton pumping station, Crewkerne

Pumping station overflow · SBB00270 · feeds CLAPTON BRIDGE_STW_CREWKERNE
No rain data

The discharge

Spill day
Saturday, 29 February 2020
Started
29 Feb 2020, 10:12
Ended
29 Feb 2020, 11:40
Duration
1 hour 28 minutes
Receiving water
Upper Axe
Parish
Wayford

Rainfall evidence

Daily rainfall at the matched gauge (South Perrott) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
29/02/2020 (spill day)no data
28/02/2020no data
27/02/2020no data
26/02/2020no data
25/02/2020no data

River flow that day: 29.409 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00270). Rainfall: EA Hydrology gauge a6860273-cf43-41ce-bf4e-1fa17257862b_398493. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.
Spill evidence — Clapton pumping station, Crewkerne — Axe & Lim Data