What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SW104985 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Axminster (Kilmington) STW | Due 2026-27 | Lower Axe |
| 08SW104986 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Axminster (Kilmington) STW | Due 2026-27 | Lower Axe |
| 08SW104949 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) BRANSCOMBE STW | Due 2026-27 | Branscombe stream |
| 08SW104950 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BRANSCOMBE STW | Due 2026-27 | Branscombe stream |
| 08SW104936 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BROADWINDSOR STW | Due 2026-27 | Upper Axe |
| 08SW104935 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) BROADWINDSOR STW | Due 2026-27 | Upper Axe |
| 08SW104886 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) COLYTON + COLYFORD STW | Due 2026-27 | Lower Axe |
| 08SW104885 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) COLYTON + COLYFORD STW | Due 2026-27 | Lower Axe |
| 08SW104504 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Drimpton STW:
Drimpton Pumping Station | Due 2026-27 | Upper Axe |
| 08SW104505 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Drimpton STW:
Drimpton Pumping Station | Due 2026-27 | Upper Axe |
| 08SW104800 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HAWKCHURCH STW | Due 2026-27 | Blackwater River |
| 08SW104799 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) HAWKCHURCH STW | Due 2026-27 | Blackwater River |
| 08SW100029 · a | WFD_INV_WRFlow | Investigation | Flow investigation, Kit Brook and wider River Axe catchment. Hook and Cotley Springs. Kit Brook abstraction | Due 2026-27 | Kit Brook |
| 08SW104737 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) LYME REGIS (UPLYME) STW | Due 2026-27 | Lim |
| 08SW104738 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LYME REGIS (UPLYME) STW | Due 2026-27 | Lim |
| 08SW104484 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Lyme Regis STW:
Gun Cliff Pumping Station, Lyme Regis | Due 2026-27 | Lim |
| 08SW104713 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) MUSBURY + WHITFORD STW | Due 2026-27 | Lower Axe |
| 08SW104712 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) MUSBURY + WHITFORD STW | Due 2026-27 | Lower Axe |
| 08SW104692 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Offwell STW | Due 2026-27 | Offwell Brook |
| 08SW104693 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Offwell STW | Due 2026-27 | Offwell Brook |
| 08SW104582 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) TATWORTH STW | Due 2026-27 | Forton Brook |
| 08SW104581 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) TATWORTH STW | Due 2026-27 | Forton Brook |
| 08SW104574 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) THORNCOMBE STW | Due 2026-27 | Upper Axe |
| 08SW104573 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) THORNCOMBE STW | Due 2026-27 | Upper Axe |
| 08SW104539 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Wilmington STW | Due 2026-27 | Umborne Brook |
| 08SW104540 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wilmington STW | Due 2026-27 | Umborne Brook |
| 08SW104535 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) WINSHAM STW | Due 2026-27 | Upper Axe |
| 08SW104536 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WINSHAM STW | Due 2026-27 | Upper Axe |
| 08SW100100 · a | BW_ND | No deterioration | 2 spills 50m3 aggregated GOSLINGS BRIDGE_CSO_LYME REGIS | Due 2026-27 | GOSLINGS BRIDGE_CSO_LYME REGIS |
| 08SW100100 · b | BW_ND | No deterioration | 2 spills 50m3 aggregated GUN CLIFF SPST_PSCSOEO_LYME REGIS | Due 2026-27 | GUN CLIFF SPST_PSCSOEO_LYME REGIS |
| 08SW100100 · c | BW_ND | No deterioration | 2 spills 50m3 aggregated HORN BRIDGE SPST_PSCSOEO_LYME REGIS | Due 2026-27 | HORN BRIDGE SPST_PSCSOEO_LYME REGIS |
| 08SW100100 · d | BW_ND | No deterioration | 2 spills 50m3 aggregated JERICHO_CSO_LYME REGIS | Due 2026-27 | JERICHO_CSO_LYME REGIS |
| 08SW100100 · e | BW_ND | No deterioration | 2 spills 50m3 aggregated MILL LN_CSO_UPLYME | Due 2026-27 | MILL LN_CSO_UPLYME |
| 08SW100100 · g | BW_ND | No deterioration | 2 spills 50m3 aggregated UPLYME STW_SSO_UPLYME | Due 2026-27 | UPLYME STW_SSO_UPLYME |
| 08SW104999 · an | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver COLYTON STW_SSO_COLYTON | Due 2027-28 | COLYTON STW_SSO_COLYTON |
| 08SW104999 · bm | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver GOSLINGS BRIDGE_CSO_LYME REGIS | Due 2027-28 | GOSLINGS BRIDGE_CSO_LYME REGIS |
| 08SW104285 · e | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver HORN BRIDGE SPST_PSCSOEO_LYME REGIS | Due 2027-28 | HORN BRIDGE SPST_PSCSOEO_LYME REGIS |
| 08SW104285 · d | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver JERICHO_CSO_LYME REGIS | Due 2027-28 | JERICHO_CSO_LYME REGIS |
| 08SW104999 · gb | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver KILMINGTON STW_SSO_AXMINSTER | Due 2027-28 | KILMINGTON STW_SSO_AXMINSTER |
| 08SW104999 · ci | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver MILL LN_CSO_UPLYME | Due 2027-28 | MILL LN_CSO_UPLYME |
| 08SW104999 · cq | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver MUSBURY & WHITFORD STW_SO_WHITFORD | Due 2027-28 | Lower Axe |
| 08SW104999 · dm | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver RAILWAY STATION_CSO_AXMINSTER | Due 2027-28 | RAILWAY STATION_CSO_AXMINSTER |
| 08SW104999 · ff | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver WHITFORD ROAD_CSO_MUSBURY | Due 2027-28 | WHITFORD ROAD_CSO_MUSBURY |
| 08SW101509 · a | HD_IMP_NN | Improvement | New or tightened P consent KILMINGTON_STW_AXMINSTER | Due 2027-28 | Yarty |
| 08SW100151 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers BRANSCOMBE STW_SSO_BRANSCOMBE | Due 2029-30 | BRANSCOMBE STW_SSO_BRANSCOMBE |
| 08SW103002 · a | EnvAct_IMP3 | Improvement | Reduction of spills to meet EnvAct_IMP drivers HARBOUR ROAD SPS_PSCSOEO_SEATON | Due 2029-30 | HARBOUR ROAD SPS_PSCSOEO_SEATON |
| 08SW101523 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers KILMINGTON STW_SSO_AXMINSTER | Due 2029-30 | KILMINGTON STW_SSO_AXMINSTER |
| 08SW102148 · c | U_IMP2 | Improvement | P limit for HD – 1mg. monitoring only KILMINGTON_STW_AXMINSTER | Due 2029-30 | Lower Axe |
| 08SW100105 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers MUSBURY & WHITFORD STW_SO_WHITFORD | Due 2029-30 | Lower Axe |
| 08SW100106 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers RAILWAY STATION_CSO_AXMINSTER | Due 2029-30 | RAILWAY STATION_CSO_AXMINSTER |
| 08SW102113 · j | U_IMP1 | Improvement | Improve discharge from agglomeration that has crossed 250 and has envirronmental imapct DALWOOD_STW_DALWOOD | Due 2030-31 | Corry Brook |
| 08SW102113 · z | U_IMP1 | Improvement | Improve discharge from agglomeration that has crossed 250 and has envirronmental imapct STOCKLAND_STW_STOCKLAND | Due 2030-31 | Yarty |
52 of 52 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.