← Clapton pumping station, Crewkerne
Spill evidence · River Hub
Clapton pumping station, Crewkerne
Pumping station overflow · SBB00270 · feeds CLAPTON BRIDGE_STW_CREWKERNE
No rain data
The discharge
- Spill day
- Friday, 18 December 2020
- Started
- 18 Dec 2020, 14:40
- Ended
- 19 Dec 2020, 07:01
- Duration
- 16 hours 21 minutes
- Receiving water
- Upper Axe
- Parish
- Wayford
Rainfall evidence
Daily rainfall at the matched gauge (South Perrott) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 18/12/2020 (spill day) | no data | |
| 17/12/2020 | no data | |
| 16/12/2020 | no data | |
| 15/12/2020 | no data | |
| 14/12/2020 | no data |
River flow that day: 66.178 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00270). Rainfall: EA Hydrology gauge a6860273-cf43-41ce-bf4e-1fa17257862b_398493. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.