← Axmouth pumping station

Spill evidence · River Hub

Axmouth pumping station

Pumping station overflow · SBB00059 · feeds SEATON STW
Wet weather

The discharge

Spill day
Thursday, 18 December 2025
Started
18 Dec 2025, 13:06
Ended
18 Dec 2025, 13:29
Duration
23 minutes 33 seconds
Receiving water
Umborne Brook
Parish
Axmouth

Rainfall evidence

Daily rainfall at the matched gauge (Beer Quarry Lane) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
18/12/2025 (spill day)16.4 mmrain
17/12/202511.3 mmrain
16/12/20250.1 mmdry
15/12/202522.3 mmrain
14/12/20255.4 mmrain

River flow that day: 40.143 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Seaton (Devon)
Shellfish water
Not Applicable
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
36 counted spills · 106 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00059). Rainfall: EA Hydrology gauge 4105d4aa-f7bd-4a61-a98d-3b40f7624380. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Axe & Lim Data.