← Locking Village

Spill evidence · River Hub

Locking Village

Pumping station overflow · WXW00632 · feeds WESTON SUPER MARE STW
Wet weather

The discharge

Spill day
Thursday, 10 October 2024
Started
10 Oct 2024, 08:28
Ended
10 Oct 2024, 10:10
Duration
1 hour 42 minutes
Receiving water
Uphill Great Rhyne - source to conf R Axe Estuary
Parish
Locking

Rainfall evidence

Daily rainfall at the matched gauge (Wick St Lawrence) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/10/2024 (spill day)0 mmdry
09/10/20242.292 mmrain
08/10/20249.927 mmrain
07/10/202411.869 mmrain
06/10/202412.935 mmrain

River flow that day: 5.45 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
10 counted spills · 49 h total
Monitor uptime (2024)
100% operational

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00632). Rainfall: EA Hydrology gauge ec5cad4f-165a-4b89-a49d-6aa36fd9c940. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Locking Village — River Brue and Axe Data