What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08WW100875 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) ALFORD WRC flow monitoring | Due 2026-27 | Brue - R. Alham to Tootle Bridge |
| 08WW100854 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) ALFORD WRC overflow monitoring | Due 2026-27 | Brue - R. Alham to Tootle Bridge |
| 08WW100650 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Bruton WRC Flow Monitoring | Due 2026-27 | Brue - Upper |
| 08WW100423 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Bruton WRC Overflow Monitoring | Due 2026-27 | Brue - Upper |
| 08WW100653 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Butleigh WRC Flow Monitoring | Due 2026-27 | Brue - Tootle Bridge to Clyse Hole |
| 08WW100427 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Butleigh WRC Overflow Monitoring | Due 2026-27 | Brue - Tootle Bridge to Clyse Hole |
| 08WW100662 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Cheddar WRC Flow Monitoring | Due 2026-27 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW100436 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Cheddar WRC Overflow Monitoring | Due 2026-27 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW100682 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Croscombe WRC Flow Monitoring | Due 2026-27 | Sheppey |
| 08WW100456 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Croscombe WRC Overflow Monitoring | Due 2026-27 | Sheppey |
| 08WW100687 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Ditcheat WRC Flow Monitoring | Due 2026-27 | Alham |
| 08WW100461 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Ditcheat WRC Overflow Monitoring | Due 2026-27 | Alham |
| 08WW100693 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Draycott WRC Flow Monitoring | Due 2026-27 | Axe - Cocklake to Brean Cross Sluice |
| 08WW100467 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Draycott WRC Overflow Monitoring | Due 2026-27 | Axe - Cocklake to Brean Cross Sluice |
| 08WW100699 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Evercreech WRC Flow Monitoring | Due 2026-27 | Alham |
| 08WW100473 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Evercreech WRC Overflow Monitoring | Due 2026-27 | Alham |
| 08WW100709 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Glastonbury WRC Flow Monitoring | Due 2026-27 | GLASTONBURY THE BECKERY STORM TANK |
| 08WW100483 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Glastonbury WRC Overflow Monitoring | Due 2026-27 | GLASTONBURY THE BECKERY STORM TANK |
| 08WW100886 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) LOXTON WRC flow monitoring | Due 2026-27 | Lox Yeo - source to conf Rive Axe |
| 08WW100864 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) LOXTON WRC overflow monitoring | Due 2026-27 | Lox Yeo - source to conf Rive Axe |
| 08WW100750 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Meare WRC Flow Monitoring | Due 2026-27 | Brue - Clyce Hole to conf North Drain |
| 08WW100522 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Meare WRC Overflow Monitoring | Due 2026-27 | Brue - Clyce Hole to conf North Drain |
| 08WW100889 · a | U_MON4 | Monitoring | MCERTS certified Flow passed forward flow monitor (U_MON4e) PARBROOK WRC flow monitoring | Due 2026-27 | Coxbridge Brook( Brue) |
| 08WW100867 · a | U_MON3 | Monitoring | MCERTS certified overflow operation monitor (U_MON3b) PARBROOK WRC overflow monitoring | Due 2026-27 | Coxbridge Brook( Brue) |
| 08WW100769 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Pilton WRC Flow Monitoring | Due 2026-27 | Whitelake |
| 08WW100541 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Pilton WRC Overflow Monitoring | Due 2026-27 | Whitelake |
| 08WW100788 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Shepton Mallet WRC Flow Monitoring | Due 2026-27 | Sheppey |
| 08WW100561 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Shepton Mallet WRC Overflow Monitoring | Due 2026-27 | Sheppey |
| 08WW100040 · a | WFD_NDINV_WRFlow | Investigation | Investigate implication of using licence that has not been used for at least 4 years. Unused licence investigation - Pitcombe spring | Due 2026-27 | Pitt |
| 08WW100825 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Wedmore WRC Flow Monitoring | Due 2026-27 | Axe - Cocklake to Brean Cross Sluice |
| 08WW100599 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wedmore WRC Overflow Monitoring | Due 2026-27 | Axe - Cocklake to Brean Cross Sluice |
| 08WW100828 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Wells WRC Flow Monitoring | Due 2026-27 | Keward Brook |
| 08WW100602 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wells WRC Overflow Monitoring | Due 2026-27 | Keward Brook |
| 08WW100839 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Winscombe WRC Flow Monitoring | Due 2026-27 | Lox Yeo - source to conf Rive Axe |
| 08WW100613 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Winscombe WRC Overflow Monitoring | Due 2026-27 | Lox Yeo - source to conf Rive Axe |
| 08WW100843 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Wookey WRC Flow Monitoring | Due 2026-27 | Axe - source to Cocklake |
| 08WW100617 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Wookey WRC Overflow Monitoring | Due 2026-27 | Axe - source to Cocklake |
| 08WW101000 · hc | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** GLEN COTTAGE CSO SO Investigation (19723C) | Due 2027-28 | WSX10135 |
| 08WW101000 · fy | EnvAct_INV4 | Investigation | Storm overflows - Investigations ***A-WINEP*** WOOKEY WATER RECYCLING CENTRE SO Investigation (13358B) | Due 2027-28 | Axe - source to Cocklake |
| 08WW101000 · mj | EnvAct_INV4 | Investigation | Storm overflows - Investigations BALTONSBOROUGH(MAIN)PUMPING STATION | Due 2027-28 | Brue - Tootle Bridge to Clyse Hole |
| 08WW101000 · mk | EnvAct_INV4 | Investigation | Storm overflows - Investigations BARTON ST DAVID PUMPING STATION | Due 2027-28 | Brue - Tootle Bridge to Clyse Hole |
| 08WW101000 · ml | EnvAct_INV4 | Investigation | Storm overflows - Investigations BROADMEAD LANE PUMP STATION | Due 2027-28 | South Drain |
| 08WW101000 · el | EnvAct_INV4 | Investigation | Storm overflows - Investigations BUTLEIGH SEWAGE TREATMENT WORKS SO Investigation (13043S) | Due 2027-28 | Brue - Tootle Bridge to Clyse Hole |
| 08WW101000 · ff | EnvAct_INV4 | Investigation | Storm overflows - Investigations CHEDDAR WASTEWATER TREATMENT WORKS SO Investigation (13057S) | Due 2027-28 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW101000 · li | EnvAct_INV4 | Investigation | Storm overflows - Investigations CHILTON POLDEN PUMPING STATION SO Investigation (14648B) | Due 2027-28 | South Drain |
| 08WW101000 · jt | EnvAct_INV4 | Investigation | Storm overflows - Investigations CLIFF STREET/REDCLIFFE STREET CSO SO Investigation (19571C) | Due 2027-28 | CHEDDAR FROGLANDS |
| 08WW101000 · ht | EnvAct_INV4 | Investigation | Storm overflows - Investigations DITCHEAT WASTEWATER TREATMENT WORKS SO Investigation (13094S) | Due 2027-28 | Alham |
| 08WW101000 · id | EnvAct_INV4 | Investigation | Storm overflows - Investigations FROGLANDS PUMPING STATION SO Investigation (14371B) | Due 2027-28 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW101000 · hn | EnvAct_INV4 | Investigation | Storm overflows - Investigations GLASTONBURY WATER RECYCLING CENTRE SO Investigation (13134S) | Due 2027-28 | GLASTONBURY THE BECKERY STORM TANK |
| 08WW101000 · ej | EnvAct_INV4 | Investigation | Storm overflows - Investigations MEARE WASTEWATER TREATMENT WORKS SO Investigation (13202S) | Due 2027-28 | Brue - Clyce Hole to conf North Drain |
| 08WW101000 · jg | EnvAct_INV4 | Investigation | Storm overflows - Investigations MILL LANE PUMPING STATION SO Investigation (14096B) | Due 2027-28 | Sheppey |
| 08WW101000 · ix | EnvAct_INV4 | Investigation | Storm overflows - Investigations PURN PUMPING STATION(WESTON-S-MARE) SO Investigation (15573B) | Due 2027-28 | Axe - Cocklake to Brean Cross Sluice |
| 08WW101000 · ns | EnvAct_INV4 | Investigation | Storm overflows - Investigations SHAPWICK PUMPING STATION | Due 2027-28 | South Drain |
| 08WW101000 · hv | EnvAct_INV4 | Investigation | Storm overflows - Investigations TOOTLE BRIDGE PUMPING STATION SO Investigation (15316B) | Due 2027-28 | Brue - Tootle Bridge to Clyse Hole |
| 08WW101000 · fd | EnvAct_INV4 | Investigation | Storm overflows - Investigations WINSCOMBE WWTW SO Investigation (13351S) | Due 2027-28 | Lox Yeo - source to conf Rive Axe |
| 08WW101002 · wg | EnvAct_IMP4 | Improvement | Storm overflows - Wetland treatment solution. BARTON ST DAVID, TOOTAL BRIDGE (Site ID 15316B) | Due 2029-30 | Brue - Tootle Bridge to Clyse Hole |
| 08WW102035 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Bruton WRC - Phosphorus Removal | Due 2029-30 | Brue - Upper |
| 08WW101002 · cx | EnvAct_IMP2 | Improvement | EnvAct_IMP4cx. Storm overflows - Frequency improvements BUTLEIGH SEWAGE TREATMENT WORKS SO improvement (13043S) | Due 2029-30 | Brue - Tootle Bridge to Clyse Hole |
| 08WW102036 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve new phosphorus permit. Butleigh WRC - Phosphorus Removal | Due 2029-30 | Brue - Tootle Bridge to Clyse Hole |
| 08WW101002 · dr | EnvAct_IMP2 | Improvement | EnvAct_IMP4dr. Storm overflows - Frequency improvements CHEDDAR WASTEWATER TREATMENT WORKS SO improvement (13057S) | Due 2029-30 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW102037 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Cheddar WRC - Phosphorus Removal | Due 2029-30 | Cheddar Yeo - source to conf Stubbingham Rhyne |
| 08WW101002 · pe | EnvAct_IMP4 | Improvement | EnvAct_IMP4pe. Storm overflows - Frequency improvements COTTAGE CSO SO improvement (19723C) | Due 2029-30 | WSX10135 |
| 08WW103014 · a | HD_IMP | Improvement | Improvements to WRC to achieve new phosphorus permit. Croscombe WRC - Phosphorus Removal | Due 2029-30 | Sheppey |
| 08WW102038 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve new phosphorus permit. Draycott WRC - Phosphorus Removal | Due 2029-30 | Axe - Cocklake to Brean Cross Sluice |
| 08WW102039 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Evercreech WRC - Phosphorus Removal | Due 2029-30 | Alham |
| 08WW102040 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Glastonbury WRC - Phosphorus Removal | Due 2029-30 | GLASTONBURY THE BECKERY STORM TANK |
| 08WW101002 · cv | EnvAct_IMP2 | Improvement | EnvAct_IMP4cv. Storm overflows - Frequency improvements MEARE WASTEWATER TREATMENT WORKS SO improvement (13202S) | Due 2029-30 | Brue - Clyce Hole to conf North Drain |
| 08WW100225 · a | WFD_IMP_CHEM | Improvement | Improvements to WRC to achieve tightened chemical permit. Shepton Mallet WRC - Chemical Improvements | Due 2029-30 | Sheppey |
| 08WW102041 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Shepton Mallet WRC - Phosphorus Removal | Due 2029-30 | Sheppey |
| 08WW102042 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve new phosphorus permit. Wedmore WRC - Phosphorus Removal | Due 2029-30 | Axe - Cocklake to Brean Cross Sluice |
| 08WW102043 · a | HD_IMP_NN | Improvement | Improvements to WRC to achieve tightened phosphorus permit. Wells WRC - Phosphorus Removal | Due 2029-30 | Keward Brook |
| 08WW101002 · dp | EnvAct_IMP2 | Improvement | EnvAct_IMP4dp. Storm overflows - Frequency improvements WINSCOMBE WWTW SO improvement (13351S) | Due 2029-30 | Lox Yeo - source to conf Rive Axe |
| 08WW103015 · a | WFD_IMPg | Improvement | Improvements to WRC to achieve new phosphorus permit. Wookey WRC - Phosphorus Removal | Due 2029-30 | Axe - source to Cocklake |
73 of 73 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.